Skip to main content

Subway station · Brooklyn

Grand St Station

Grand Street

L

Accessible (ADA)

Next trains

L Canarsie platforms

Manhattan ADA

  • L8 AvLive · 3 min latenow6:48 PM
  • L8 AvLive · 4 min late5 min6:53 PM
  • L8 AvLive · 4 min late9 min6:57 PM
  • L8 AvLive · 2 min late10 min6:59 PM

Outbound ADA

  • LCanarsie-Rockaway PkwyLive · 1 min latenow6:48 PM
  • LCanarsie-Rockaway PkwyLive · 2 min late4 min6:53 PM
  • LCanarsie-Rockaway PkwyLive · 2 min late8 min6:56 PM
  • LCanarsie-Rockaway PkwyLive · 2 min late11 min6:59 PM

Data may not be real time. “Live” times come from MTA real-time feeds as processed by our trip planner; “Scheduled” times come from published timetables. This site is independent and not affiliated with the MTA. Updated 6:48 PM ET; refreshes every 30 seconds.

Service alerts

Planned work coming up

UpcomingBoarding ChangeLIn Manhattan, all L trains at 1 Av and 3 Av board from the Brooklyn-bound platform

Every Wed and Fri, 1:30 AM to 5:00 AM

Note: Some nights, this boarding change will be suspended or begin later because of other work along the L line.

What's happening?

Track maintenance

Posted Oct 16, 2026, 4:02 AM

UpcomingReduced ServiceLIn Brooklyn, L runs every 16 minutes between Canarsie-Rockaway Pkwy and Broadway Junction

Oct 27 - 30, Tue to Fri, 11:00 AM to 3:00 PM

L service runs in two sections:

1. Between Canarsie-Rockaway Pkwy and Broadway Junction

2. Between Broadway Junction and 8 Av, every 8 minutes

Transfer at Broadway Junction to continue your trip.

What's happening?

We're replacing tracks

Posted Sep 30, 2026, 3:15 PM

UpcomingBoarding ChangeLIn Manhattan, all L trains at 3 Av and 1 Av board from the 8 Av-bound platform

Every Tue and Thu, 1:30 AM to 5:00 AM

Note: Some nights, this boarding change will be suspended or begin later because of other work along the L line.

What's happening?

Track maintenance

Posted Aug 11, 2026, 4:09 AM

Alerts from MTA service alert feeds, shown as published (English). Data may not be real time.

Elevators & escalators

  • No outage Elevator EL785 · L
    Street (NE corner of Bushwick Avenue and Grand Street) to 8 Ave-bound platform
  • No outage Elevator EL786 · L
    Street (NW corner of Bushwick Ave and Grand St) to Canarsie-Rockaway Pkwy-bound platform

Last 30 days: 1 outage recorded (≈ 1 hours out of service in total). Tracking since Oct 11, 2026.

Status from the MTA elevator & escalator feed, checked every 5 minutes. “No outage” means the unit is not listed as out of service; it does not guarantee it is working. All outages.

First & last trains (scheduled)

Line & directionWeekdaySatSun
L 8 Av 24 hours24 hours24 hours
L Canarsie-Rockaway Pkwy 24 hours24 hours24 hours

From the published schedule (reference dates Oct 20, 2026, Oct 24, 2026, Oct 18, 2026). Late-night service may differ; overnight trips after midnight are shown as early-morning times.

Map & entrances

6 entrances: 4 stairs, 2 elevators.

Entrance locations: MTA Subway Entrances and Exits (data.ny.gov). Blue dots = stairs/escalators, green = elevators.

Directions to this station

Accessibility

  • L Grand St (Canarsie) Accessible

ADA status from MTA Subway Stations (data.ny.gov). Check elevator status above before you travel.

Transfers nearby

  • BusRoutes within 800 ft: Q54Q59

Nearby stations

Citi Bike nearby

  • Bushwick Ave & Powers St
    1 bikes (0 e-bikes) · 28 open docks
    220 ft
  • Powers St & Olive St
    2 bikes (0 e-bikes) · 14 open docks
    0.1 mi
  • Bushwick Ave & Stagg St
    6 bikes (2 e-bikes) · 13 open docks
    0.1 mi

Availability from the Citi Bike public GBFS feed. Data may not be real time. Not affiliated with Lyft or Citi Bike.