Skip to main content

Subway station · Manhattan

50 St Station

50th Street

12

Not accessible 1 service alert

Next trains

1 Broadway - 7Av platforms

Uptown

  • 1Van Cortlandt Park-242 StLive · 1 min late4 min7:46 PM
  • 1Van Cortlandt Park-242 StLive · 1 min late7 min7:50 PM
  • 1Van Cortlandt Park-242 StLive · 2 min late13 min7:55 PM
  • 1Van Cortlandt Park-242 StLive · 1 min late16 min7:58 PM

Downtown

  • 1South FerryLive · 2 min late1 min7:44 PM
  • 1South FerryScheduled4 min7:46 PM
  • 1South FerryScheduled9 min7:51 PM
  • 1South FerryLive · 1 min early13 min7:55 PM

Data may not be real time. “Live” times come from MTA real-time feeds as processed by our trip planner; “Scheduled” times come from published timetables. This site is independent and not affiliated with the MTA. Updated 7:42 PM ET; refreshes every 30 seconds.

Service alerts

NowDelays11 trains are running with delays in both directions while we address a signal problem near Rector St.

Posted Oct 16, 2026, 6:15 PM

Planned work coming up

UpcomingReduced Service11 runs every 8 minutes

Nov 14 - 15 and Nov 21 - 22, Sat and Sun, days and evenings

1 service operates on a modified schedule because 12 and 3 trains are sharing a track in Manhattan.

What's happening?

Structural maintenance

Posted Oct 16, 2026, 11:27 AM

UpcomingReduced Service2323 runs every 12 minutes

Nov 14 - 15 and Nov 21 - 22, Sat and Sun, days and evenings

23 service operates on a modified schedule because 12 and 3 trains are sharing a track in Manhattan.

What's happening?

Structural maintenance

Posted Oct 16, 2026, 11:24 AM

UpcomingReduced Service22 runs approximately every 15 minutes

Nov 8 and Nov 15, Sun, 7:45 AM to 10:00 AM

2 operates on a modified schedule because trains are running on a single track at 3 Av-149 St.

What's happening?

Track maintenance

Posted Oct 13, 2026, 9:05 AM

UpcomingReduced Service22 runs approximately every 15 minutes

Oct 18, Sunday, 7:45 AM to 10:00 AM

2 operates on a modified schedule because trains are running on a single track at 3 Av-149 St.

What's happening?

Track maintenance

Posted Oct 12, 2026, 7:40 AM

Alerts from MTA service alert feeds, shown as published (English). Data may not be real time.

Elevators & escalators

No elevators or escalators are listed for this station in the MTA equipment feed.

Status from the MTA elevator & escalator feed, checked every 5 minutes. “No outage” means the unit is not listed as out of service; it does not guarantee it is working. All outages.

First & last trains (scheduled)

Line & directionWeekdaySatSun
1 Van Cortlandt Park-242 St 24 hours24 hours24 hours
1 South Ferry 24 hours24 hours24 hours
2 Wakefield-241 St 3:24 AM –
3:03 AM
3:22 AM –
2:58 AM
3:18 AM –
3:02 AM
2 Flatbush Av-Brooklyn College 1:13 AM –
12:53 AM
1:12 AM –
12:51 AM
1:12 AM –
12:52 AM

From the published schedule (reference dates Oct 20, 2026, Oct 24, 2026, Oct 18, 2026). Late-night service may differ; overnight trips after midnight are shown as early-morning times.

Map & entrances

6 entrances: 3 easements, 3 stairs.

Entrance locations: MTA Subway Entrances and Exits (data.ny.gov). Blue dots = stairs/escalators, green = elevators.

Directions to this station

Accessibility

  • 1 50 St (Broadway - 7Av) Not accessible

ADA status from MTA Subway Stations (data.ny.gov). Check elevator status above before you travel.

Transfers nearby

Nearby stations

Citi Bike nearby

  • W 51 St & 7 Ave
    0 bikes (0 e-bikes) · 77 open docks
    360 ft
  • Broadway & W 48 St
    4 bikes (1 e-bikes) · 93 open docks
    0.1 mi
  • Broadway & W 53 St
    4 bikes (2 e-bikes) · 77 open docks
    0.1 mi

Availability from the Citi Bike public GBFS feed. Data may not be real time. Not affiliated with Lyft or Citi Bike.